Protecting individual doors
The protection mechanism for individual doors is examined below based upon the assumption that only one door is open at any time. Within the overall supply volumes available it is not possible to provide protection for more than one open door at a time.
Disposal Corridor
Disposal Single door - Required flow 0 m3/s (Dirty) (Dirty)
No door protection flow is required.
Protecting Individual Open Doors
- Lay-up Prep - Corridor Door Open
- Lay-up Prep - Theatre Door Open
- S.P.S Prep - Corridor Door Open
- Theatre - Anaesthetic Door Open
- Theatre - Exit Bay Door Open
- Scrub - Corridor Door Open
- Theatre - Disposal Door Open
- Anaesthetic - Corridor Door Open
- Clean Corridor - Disposal Door Open
- Disposal Corridor